Chart Pie

Hi,
I convertet my Project from latest 8.1 to 9 without Problems during this Process.:).

During the test I noticed that the pie chart and others, are not highlighted.

Any Idea?

regards
Salvi

Confirm, pie charts, if there are 2 sizes will not work. Also, styles set with version 8.1 are not maintained.
On the toolbar if you click on the 3d column icon the graph changes style. This with version 8.1 did not happen. The pie is no longer selectable.
In the attached video you can see my situation.
I think it is to restore the operation of the previous version.
Thanks for the support.

[ATTACH=CONFIG]n76819[/ATTACH] [ATTACH=CONFIG]n76820[/ATTACH] [ATTACH=CONFIG]n76821[/ATTACH] [ATTACH=CONFIG]n76822[/ATTACH]
The first image shows the pie-shaped pie button off. If I have two dimensions not activated, a dimension will turn on.
The second image shows the initial bar graph 3d. By clicking on the button on the toolbar, the graph is transformed into 2d and also changes the style. In the previous version it did not happen.

chart_pie_disable.jpg

chart_column3d.jpg

chart_column3d_level2.jpg

chart_column2d.jpg

Hello,

Ok, if i understand right, this is a real bug from SC9 and not my mistake

For me yes.
In the previous version everything worked.
I hope you have everything because I have an application that migrating to version 9 would lose a feature.

At the moment I still work with 8.1
My productive project includes 297 applications, that takes a while until I have tested everything !!!